Taman Kinding Akasia Phase 3A Chemor Review — Pros and Cons
Quick answer
Taman Kinding Akasia Phase 3A is a landed property in Chemor, Perak, developed by Pesat Padu Villas.
It is leasehold, with 70 in Phase 3A, out of 154 across the development units, from 70 sq ft, in 3-bedroom layouts. Completion is targeted for November 2027.
Taman Kinding Akasia Phase 3A is a single-storey terrace release at Kinding, on the Chemor side of north Ipoh, by Pesat Padu Villas. The development runs to 33.25 acres and 154 houses across twelve blocks, A to L; Phase 3A advertises 70 units, with blocks I, J, K and L the ones currently released.
The house is a 20 ft by 70 ft lot with three bedrooms and two bathrooms on one level — the master at the front off the living area, two more bedrooms behind it, the bathrooms back to back in the middle, and the dining area and kitchen running to the rear. The porch takes two cars.
What you are buying at Taman Kinding Akasia Phase 3A
The figures below are what the developer publishes for Taman Kinding Akasia Phase 3A. Anything not published is left blank rather than estimated.
| Detail | Information |
|---|---|
| Location | Chemor, Perak |
| Tenure | Leasehold |
| Land Title | Individual |
| Property Type | Landed Property |
| Developer | Pesat Padu Villas |
| Completion | November 2027 |
| Total Units | 70 in Phase 3A, out of 154 across the development |
| Blocks | 12 blocks, A to L |
| Land Area | 33.25 acres |
| Car Parks | Can park 2 cars |
| Built-up | 70 sq ft |
Why choose Taman Kinding Akasia Phase 3A?
Five things separate Taman Kinding Akasia Phase 3A from the other launches in Chemor.
- Single storey — three bedrooms with no stairs
- Master bedroom at the front, off the living area
- Two-car porch across a 22 ft depth
- 33.25-acre development with twelve blocks, so the neighbourhood builds out around you
- Statutory completion November 2027, with a current advertising permit
- Chemor and Bandar Baru Sri Klebang nearby for schools and daily shopping
- Jelapang toll for the North-South Expressway, and Aeon Mall Ipoh Klebang for the mall run
Who Taman Kinding Akasia Phase 3A does not suit
Every project trades something away. These are the trade-offs here, so you can rule it out quickly if one of them is a dealbreaker.
- Leasehold to 2115, and not gated and guarded. Ninety years of lease left is comfortable for own-stay but is not freehold, and there is no perimeter or guardhouse. Neither can be changed after the fact.
- One house type, three bedrooms, and that is the ceiling. Every unit in Phase 3A is the same single-storey terrace on a 20 ft by 70 ft lot. If you need a fourth bedroom or a wider frontage, this phase has nothing to move up to.
- The unit count in the developer’s own paperwork does not reconcile. The statutory panel prints 70 units for the advertised phase while the summary gives a different figure for the development. Ask which phase and which plot number you are actually being sold, and get it written into the booking form.
Layouts. 1 layouts, 70 sq ft in 3-bedroom configurations. The full table, with the developer's own floor plans, is on the Taman Kinding Akasia Chemor Ipoh page.
Where it is. Taman Kinding Akasia Phase 3A is in Chemor, Perak. The full rundown of what is around it — rail, schools, hospitals and retail, with distances — is on the project page.
Taman Kinding Akasia Phase 3A compared with other Chemor and Klebang projects
Same area, different trade-offs. Worth opening side by side with Taman Kinding Akasia Phase 3A before you shortlist.
- Klemeru Ipoh Klebang Meru — Eadepro Group, Leasehold. · read the review
- Rimbayu Tanjung Rambutan Ipoh — VIP Waves Sdn Bhd, Leasehold, completing Q1 2028. · read the review
- Desa Chemor Impian 2 Ipoh — Liew Yin Yin Group, Leasehold, completing Q4 2027. · read the review
Taman Kinding Akasia Phase 3A: frequently asked questions
Is Taman Kinding Akasia Phase 3A freehold or leasehold?
Taman Kinding Akasia Phase 3A is held on leasehold title. The land use is Individual.
How many units does Taman Kinding Akasia Phase 3A have?
70 in Phase 3A, out of 154 across the development units.
What sizes are available at Taman Kinding Akasia Phase 3A?
Built-up runs from 70 sq ft across 3-bedroom layouts.
When is Taman Kinding Akasia Phase 3A completed?
Completion is targeted for November 2027.
Who is the developer of Taman Kinding Akasia Phase 3A?
Taman Kinding Akasia Phase 3A is developed by Pesat Padu Villas.
Is Taman Kinding Akasia gated and guarded?
No. The developer's project summary records it as not gated and guarded.
Full specification, floor plans and photos
Taman Kinding Akasia Chemor Ipoh — unit types, built-up sizes, facilities and the developer's own floor plans.
Still comparing? New Project in Ipoh & Perak 2026 lists every Ipoh & Perak project we cover, with tenure, built-up and floor plans on each one.
20 Sep 2026